During this period, support requests requiring network or system changes will be deferred until the end of the change freeze, with the exception of fault-fixing activities. This freeze also includes cabling work, which will be suspended, in some cases by the co-location facility operators themselves. Therefore, no adds, moves, or changes for member ports will be performed during this period.
Our 24×7 NOC remains available throughout the holiday period and are contactable via the LINX Member Portal chat function or by emailing [email protected]